|
Sr. Member
Total Posts: 546
Joined 2008-10-15
|
Not easy to answer, but it is common for repair centres to ask a deposit of say £30/40 before they even undo a screw.
They would then evaluate the unit to see what needs to be done, if it doesn't need that much they would repair it there and then (up to a reasonable cost).
If major surgery if required, and expensive bits need to be replaced then you would be contacted to see if you want to go ahead if the repair. If you decide not to, you would lose your deposit.
K nobs can also be called controls..
|